Free PDF guide for schools
Summer Shutdown Checklist for Schools
Six weeks sounds like plenty. Once Christmas, New Year and trade closures are taken out, most schools have about four working weeks to finish their summer works. This 11-page guide and checklist helps business managers, bursars and facilities leads plan the shutdown week by week, keep contractors safe on a school site and open on Day 1 ready.
What’s inside
✓
Term 4 planning. Checklists to find the gaps, rank and approve works within the 2027 budget, and book contractors before trades close for Christmas.
✓
Six-week shutdown plan. A week-by-week plan in four stages, with planned maintenance and deep-clean checklists in the right order, so rooms are only cleaned once.
✓
NSW compliance checks. The annual fire safety statement, emergency lighting, test and tag, backflow, asbestos, playgrounds and more, in one table to confirm each is current or booked.
✓
Contractors and child safety. Working with Children Check verification, site inductions, supervision, keys and access for a campus where children may still be on site.
✓
Day 1 sign-off and board summary. An area-by-area walk-through sheet and a one-page summary for your board: what was done, what is outstanding and what it cost.
11-page PDF for independent schools in metropolitan Sydney. Print it and tick it off as you go, and adjust the week numbers to your own school calendar.
PlaceHQ
Summer Shutdown Checklist
A free six-week plan for independent schools
Get the free checklist
Fill in your details and you can download the checklist straight away.
Thanks, here’s your checklist
Your Summer Shutdown Checklist is ready. Download it now and start with Section 2: Plan in Term 4.
Download the checklist (PDF)Sorry, something went wrong. Please check your details and try again.